EnergoFront supplies fuel oil pump NKV 360/320-b S/Kh U2
12 December 2022
Starting from 2020, we, together with the general contractor, are implementing a project for the technical re-equipment of the fuel oil facilities of the joint venture CHPP-3 of JSC TGC-11 in Omsk.
As a second lift pump MEN-2, a pump produced by Volgogradneftemash JSC was proposed and agreed upon – NKV 360/320-b S/Kh U2 with parameters Q=290 m3/h, H=305 m, which fully complies with the requirements of Rostekhnadzor for oil pumps and the requirements of the technical specifications.
With wishes for stable development,
EnergoFront team #FrontProject
