Energy block No. 3 of Berezovskaya GRES

20 August 2012

Berezovskaya GRES has been part of OGK-4 since 2006, the controlling stake of which belongs to the German concern E.ON. 

On July 8, 2011, the corporate name of JSC OGK-4 was changed to JSC E.ON Russia (JSC E.ON Russia).

Tens of kilometers from the city of Sharypovo, Krasnoyarsk Territory, the chimney of the Berezovskaya State District Power Plant is visible - one of the main symbols of the city. The chimney, 370 meters high, is the highest industrial facility in Russia.

1.jpg

But this is not the only feature of the station. Berezovskaya GRES has a unique fuel supply scheme. The brown coal on which the station operates comes directly from the Berezovskoye deposit in the Kansk-Achinsk basin via two 14.8-kilometer open conveyors.

The station is not equipped with cooling towers - the Berezovskoye reservoir on the Beresh River (Chulym sub-basin, Ob ​​basin) is used for cooling.

Station history

Construction of the Berezovskaya State District Power Plant began in 1976. The technical design of the state district power plant envisaged the construction of 8 power units of 800 MW each. Thus, the planned installed capacity of the station was to be 6400 MW. The launch of the first power unit took place on December 1, 1987, the second power unit was launched in April 1990. Then construction funding was suspended. The design capacity of the station was 1600 MW. However, soon after the launch, the capacity of the existing power units was reduced from the design 1600 MW to 1400 MW. This happened due to intensive slagging of the heating surfaces of the boilers when operating on high-ash coals from the Berezovsky deposit at maximum power parameters. The station's specialists have developed a number of measures to increase the power of the boilers. A cleaning complex was introduced, the latest systems for diagnosing slagging and automatic control of water blowing devices were used at that time, and optimization of blowing modes and parameters was carried out. All this made it possible in January 2006 to increase the installed capacity of Berezovskaya GRES to 1,500 MW.

Two power units of the Berezovskaya State District Power Plant, each with a capacity of 800 MW, have generated more than 150 billion kWh of electricity since the station was launched. The number of station personnel is about 1000 people.

Berezovskaya GRES is a major supplier of electrical energy to the market; in addition, the station provides heat and hot water to industrial enterprises, institutions and residential buildings in the city of Sharypovo, the villages of Dubinino and Kholmogorskoye. At this power plant, for the first time in history, a steam pulverized coal boiler (suspended, single-case, T-shaped layout) was mastered. It was manufactured at the Podolsk Machine-Building Plant named after Ordzhonikidze. Boiler brand P-67, productivity 2,650 tons of steam per hour at supercritical parameters.

Construction of power unit No. 3

The investment program of E.ON Russia provides for the construction of the third power unit of the Berezovskaya State District Power Plant with a capacity of 800 MW. In May 2011, an agreement was concluded with the general contractor of the project, Energoproekt CJSC.

JSC EMAlliance was chosen as the general designer. The new power unit is expected to be commissioned at the end of 2014.

As a dust preparation scheme, the system of eight MV3400/900/490 mill-fans produced by OJSC Tyazhmash, previously used in the 2 previous units, will be used symmetrically located around the boiler unit.

Task: Selection and supply of an electric drive for the MV3400/900/490 fan mills as part of the project for the construction of power unit No. 3.

At this station, a dust preparation system was used for the first time for combustion in a boiler - eight mill-fans, located symmetrically around the boiler unit, directly blow coal dust into the furnace. Mill brand MV3400/900/490 with a rotor diameter of 3400 mm. The manufacturer of the mills is the Syzran Heavy Engineering Plant (currently JSC Tyazhmash).

2.jpg

Drawing of a mill-fan

Mill drive motors

To drive the mills, based on the results of the competition, ADOT-1000-6000-12U3 electric motors produced by NPO Elsib were selected.

The supply of electric motors is carried out by the official representative of the plant - the company NPP TechnoProekt CJSC, which, based on the study of technical specifications and questionnaires, selected the most optimal and modern drive options.

3.jpg

Dimensional drawing of the electric motor

The choice of ADOT-1000-6000-12U3 electric motors was made based on high performance characteristics, wide experience of use (including at previous units of the Berezovskaya State District Power Plant), and high reliability.

Electric motors are designed specifically for harsh operating conditions, including mills and crushers, have a high degree of protection IP54 and allow operation both in dusty rooms and in the open air.

They have reinforced bearing supports and are designed for high shock loads and direct starting of heavily loaded mechanisms.

4.jpg

Appearance of electric motors ADOT-1000-6000-12U3

Dynamic braking devices

According to clause 3.4.11 of the instructions for ensuring the explosion safety of fuel supplies and installations for the preparation and combustion of pulverized fuel (SO 153-34.03.352-2003), in order to reduce the run-down time of the rotors of mill-fans, characterized by a high moment of inertia, their electric drives must be equipped with electrodynamic braking devices.

In this regard, the company ZAO NPP TechnoProekt, together with ZAO Energokomplekt, carried out work on the development of electrodynamic braking devices to reduce the run-down time of ADOT-1000-6000-12U3 electric motors.

The result was the EK-DB-200-60 UHL4 dynamic braking device.

5.jpg

Block diagram of the Dynamic Braking Device

The principle of operation of the device is the supply of direct current to two phases of the stator. The EK-DB thyristor rectifier is used as a braking device.

Dynamic braking is performed according to the following algorithm:

1. The engine is disconnected from the network (using a RU-6kV switch).

2. The engine is connected to the braking device (switch in ShKR).

3. The braking device (EX-DB) supplies direct current to the motor and regulates it (reduces it during braking).

4. After a complete stop, the braking device (EX-DB) turns off the current.

5. The engine is disconnected from the braking device (by a switch in the ShKR).

6.jpg

Appearance of Dynamic Braking Device

This device allows you to stop the electric motor with the mechanism (mill) within the 4-6 minutes specified in the technical specifications, while the natural run-down of the electric motor with the mechanism is 35-40 minutes.

In this case, the heating of the electric motor elements does not exceed the heating during direct start of the electric motor with the mill, which has a beneficial effect on the service life of the ADOT-1000-6000-12U3 electric motors.

The device also makes it possible to adjust the braking time by changing the magnitude of the braking current and the rate of its change. Thus, the requirements for explosion safety of fuel supplies are implemented and the ability to quickly shut down and reset the power of the power unit is achieved.

Project implementation

The supply of ADOT electric motors to Berezovskaya GRES according to the terms of the contract is carried out in two batches of 4 pcs. Each batch contains 2 right-hand rotation electric motors and 2 left-hand rotation electric motors. Dynamic braking devices are supplied in one batch (all 8 pieces) with the first batch of electric motors.

NPP TechnoProject CJSC supplied the 1st batch of electric motors and all 8 dynamic braking devices. All equipment was delivered on time, in proper form with the necessary set of documents.

The 2nd batch of electric motors is currently being produced. Delivery time to the final customer (Berezovskaya GRES) is December 2012.

NPP TechnoProekt CJSC, after delivering the entire supply volume to Berezovskaya GRES, plans to carry out supervision of installation and commissioning of equipment. The equipment warranty is provided in accordance with the manufacturer's terms and conditions.