Since 2020 we are implementing a project for technical re-equipment of the fuel in economy of the joint venture "CHP-3" JSC "TGC-11 in Omsk together with the general contracting organization.
As a pump of the second lift of the Men-2, a pump of production of Volgogradneftemash JSC - NKV 360/320-B C / H U2 with parameters Q = 290 m3 / h, H = 305 m, fully relevant to the requirements of Rostekhnadzor to the oil pumps and the technical task requirements.
With the wish of stable development,
team EnergoFront #FrontProject
Share: